national

The Minister of Irrigation promises radical solutions to the water crisis – New Algeria

oussama

The Minister of Irrigation promised Taha DarbalBy providing radical solutions through a set of available suggestions, to eliminate the drinking water supply crisis in the state of TI wish.

The minister highlighted in a media statement at the conclusion of a working visit and inspection of his leaders to the state that all solutions will be discussed technically and studied, including bringing desalinated water or connecting from wells.Ajramaya“.

Darbal explained that this falls within the framework of ensuring a sustainable supply of this substance to citizens, since the sector has the green light from Higher authorities For the country, led by the President of the Republic, Mr. Abdelmadjid Tebboune, in order to provide optimal care for the citizens of this state, like all states of the country.

As a reminder, the “Ajramaya” water field is located in the municipality of Zamala Abdelkader in the Mandatory State To Shalala PalaceIt has 19 artesian wells with a total capacity estimated at 400 liters per second, which is equivalent to 34 thousand cubic meters per day.

Darbal stated that directives have been given to submit technical cards to complete very deep exploratory wells in coordination with the National Water Resources Agency, to identify groundwater capabilities across various regions of the state.

In another context, the Minister of Irrigation ordered optimal care for the recovery and use of filtered waste water, especially since it can be exploited for agricultural, industrial and service purposes.

It should be noted that the Minister supervised during the evening of his visit the exploitation of an artesian well in the village of Si Hawass, with a flow of 20 liters per second, intended to supply the city of Mahdia with drinking water.

While he followed a presentation on the program to supply the capital of Tiaret with water, as the population is currently being supplied one day every six days, with the situation improving during the coming month of July to become one day every three days. After three wells from the Sidi Clear field entered service, in addition to the project to bring water from the eastern shore. The work will begin next April, according to the explanations provided by the state’s director of water resources, Khatheer Mahmoudi.

Darbal also received a presentation on the project to rehabilitate the used water filtration plant, which will cost 2.9 billion dinars. He also inspected the “Bakhda” Dam, which currently contains 2 million cubic meters of water, while its capacity is 37 million cubic meters.

#Minister #Irrigation #promises #radical #solutions #water #crisis #Algeria




oussama_boulegheb

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

يجي اقاف حظر إعلانك

يجي اقاف حظر إعلانك وشكرا